Local News · News

Horwood Place Traffic and Parking Changes Begin 16 November in Parramatta

The next stage of Civic Link changes access near Phillip Street, with permanent removal of some street parking and temporary pedestrian diversions.

Harbour Creative TeamHarbour Creative Team

2 min read

Keep this story in your reading list
Official council concept-design animation published in 2024. This illustrates the proposed project, not footage of November 2026 road works. · City of Parramatta · 5 March 2024
Share article
0%
Ways to read

Motorists and pedestrians moving through central Parramatta should prepare for changes around Horwood Place from Monday 16 November 2026.

The City of Parramatta says the second stage of its Civic Link Block 3 project will start in the northern section of Horwood Place near Phillip Street. The project is intended to create a green pedestrian connection between the CBD and Parramatta River.

What will change?

Council says Horwood Place will be permanently closed to through traffic to Phillip Street. Some on-street parking will be removed permanently to make way for the planned public space.

Temporary footpath closures will also be required, with pedestrians directed to alternative routes during work. Traffic controllers are expected to assist movements around Phillip Street and Horwood Place/Auctioneer Lane when necessary.

Can drivers still use Eat Street Car Park?

Yes. Council states that Eat Street Car Park will remain open 24 hours a day, though access arrangements are affected by the works. The published notice identifies approaches via Erby Place and Auctioneer Lane and advises motorists to follow current signs and traffic controllers.

Drivers should not assume the former route into or out of the car park remains unchanged. Check council instructions before travelling, especially on busy event days.

How long will construction last?

The published work programme is around 45 weeks, with the Civic Link Block 3 opening anticipated in late 2027, subject to weather and site conditions. Normal work hours are generally 7am to 5pm Monday to Friday and 8am to 1pm Saturday, with possible exceptions.

Watch the project concept

Parramatta Council also maintains an official Civic Link video gallery featuring an earlier concept-design animation. It illustrates the design vision and is not footage of construction taking place in November 2026.

Source: City of Parramatta — Civic Link Block 3, stage two notice.

About this article

This article is published by Harbour Creative Blogs. Sources and supporting material, where applicable, are linked within the article.

Found an error? Contact the editorial desk. See our editorial standards and corrections policy.

From the Harbour Creative Blogs archive

Keep exploring this story

Related reporting, people and places from our published coverage. These are editorial connections, not a popularity ranking.